For roofing contractors

Roofing permits, drafted by AI.

Drop the job. Harv triages it, Filo drafts the packet, Qira pre-flights for rejections, then a licensed Texas permit tech signs off and files. Tarrant County, Fort Worth, Dallas, Arlington, Plano, Frisco. $249 flat-fee.

  • $249 flat per permit
  • Avg. file time: 3–5 days
  • Unlimited revisions
What we file

The full DFW re-roof checklist, automated.

Every required attachment, every jurisdictional quirk, encoded as a rule before your job ever hits the queue.

Tarrant County (unincorporated)

  • Permit triggered only when decking is replaced — we ask the right intake question.
  • Cricket details auto-included on chimneys 30″+ wide.
  • Drip edge spec called out per IRC 2018.
  • Wind-load classification matched to the property.
  • Fire Marshal coordination if needed (817-838-4660).

Fort Worth, Dallas, Arlington, Plano, Frisco

  • Accela uploads handled end-to-end (Fort Worth + Dallas).
  • HOA acknowledgement attached for Plano & Frisco.
  • Contractor license + insurance auto-pulled from your profile.
  • Inspection scheduling once the permit is approved.
  • Status pushed to your dashboard on every state change.
Workflow

From job sheet to filed permit.

1 🟧 Harv

Triages the job

Address, scope, photos. Harv reads the intake, picks the jurisdiction, flags missing fields.

2 🟦 Filo + 🔍 Qira

Drafts & pre-flights

Filo writes the city's PDF; Qira runs a 40-point QA pass to block rejections before they happen.

3

Human reviewer signs

Licensed Texas permit tech reviews the AI packet, signs off, and submits through the city portal.

4 🟪 Nova + 🟩 Ledge

You get the number

Nova emails the application number within minutes of filing. Ledge reconciles the city fee on your card.

Sentinel and Scout work in the background — Sentinel watches the whole stack every 5 minutes; Scout keeps every city's rules current. Meet all 7 agents →

Coverage

Live in Dallas–Fort Worth.

Click your jurisdiction for the full checklist and turnaround time.

Stop chasing permits

Hand your next roofing permit to the AI team.

3–5 business days. Flat fee. Free for your first three during beta.