Roofing · Dallas

Roofing permits in Dallas.

Standard re-roof permit through Dallas's Accela portal. We document tear-off, decking condition, and underlayment spec to IRC 2018.

  • Flat fee: $249
  • Avg. turnaround: 3–5 business days.
Jurisdiction rules

What we file in Dallas.

  • Permit required for re-roofs and decking replacement.
  • Filed through Accela citizen portal.
  • Documentation of tear-off and decking condition required.
  • Contractor license verified on file.
  • Inspection coordination after approval.
Workflow

How a Dallas permit moves through PermitsDone.

1

Drop the job

Address, scope, photos. We classify the jurisdiction and pre-empt rejections.

2

AI drafts the packet

The right form, the right attachments, encoded for Dallas.

3

Pre-flight + review

40-point checklist, then a licensed permit tech signs off.

4

Filed via the portal

Submitted through Accela Citizen Access (Dallas). Application number in your inbox.

Stop chasing permits

Hand your next permit to four AI agents.

3–5 business days. Flat fee. Free for your first three during beta.